Case Studies

The models are usually developed to test different traffic management schemes, public transport priority measures, new signalised junctions, shared space … to name but a few. Below are few videos of our recent projects:

Junction Design:

Single junction improvement for a proposed development in Stockport.

Driver’s Point of View:

Richmond Walk in Plymouth:

4CEngine was commissioned by Hydrock to build a microsimulation model to tests the operational performance of the corridor when traffic generated by the proposed new residential development is loaded onto existing network.  The option testing was undertaken using the latest S-Paramics 2014.1 software.